Corporate Brochure
>> Click here to download
Virgin Media Crest House
March 2009
Scope of works The project was to plan, design and carry out a complete electrical upgrade of the site. This included the installs of; Temporary generator including cabling and connections. A new 350kVA generator and removal of old. 1000 amp Auto changeover panel. Temporary 80kVA UPS. 3 x new 60 kVA UPS systems. Cabling, connections and containment for the 3 x UPS systems. LV Panel extension. New comms room, including AC & DC Distribution, cabling and connections. The upgrade of the main rectifier plant. All AC & DC cutovers of equipment onto the new systems. Working in the role of Principal Contractor, T James Electrical was responsible for all of the health and safety on site, as well as producing the Construction phase health and safety file. Case study written by Craig Dobbs
March 2009
Scope of works The project was to plan, design and carry out a complete electrical upgrade of the site. This included the installs of; Temporary generator including cabling and connections. A new 350kVA generator and removal of old. 1000 amp Auto changeover panel. Temporary 80kVA UPS. 3 x new 60 kVA UPS systems. Cabling, connections and containment for the 3 x UPS systems. LV Panel extension. New comms room, including AC & DC Distribution, cabling and connections. The upgrade of the main rectifier plant. All AC & DC cutovers of equipment onto the new systems. Working in the role of Principal Contractor, T James Electrical was responsible for all of the health and safety on site, as well as producing the Construction phase health and safety file. Case study written by Craig Dobbs